Dallas Lodge #182, F&A.M.

      "Share the Light"

Skip Repetitive Navigational Links

Members, login here

News Articles

Here you will find articles pertaining to upcoming and recently held events of the lodge. Check back often as we will share as often as we can!

« Previous article

Upcoming Lodge Work Day Set for March 14, 2009

Tuesday, February 17, 2009

The first workday is scheduled for March 14th. It is planned to have one each quarter of the year. The primary focus of the first workday will revolve around carpentry, preparation and cleaning. Painting will take place on the next workday May 16th. Keep in mind that anyone who would like to donate time, talent and/or supplies for the workday or any time other than the work day will be welcomed and assisted. If anyone has specific talents with carpentry and paint preparation please let me know as soon as possible so we can organize the group for the first workday. We will need one group for the work and another group to follow up later in the day for cleaning up and general cleaning. Let us know if you can help ASAP!

Email Chris McLean (Senior Warden) at salesnow@aol.com

Lodge Room
Repair 9 metal ceiling tiles and paint
Inspect seats and make repairs
Attach wheels to pillars
Decorate walls with memorabilia
Need suggestions on wall repairs and painting
Install shelf at secretary’s desk
Freshen up and/or repaint lodge furniture


Preparation Room
Box in furnace with bead board and bi-fold doors
Cover elevator with bead board
Replace bad ceiling tiles
Install closet pole under shelf
Tie up black pipe
Paint


Upstairs Foyer
Bead board west wall
Fix light
Switch plate covers
Fix light
Paint


Stairs
Replace bad ceiling tiles
New handrails both sides
Paint all walls and trim
Insulate pipes from freezing


Downstairs Foyer
Fix light
Replace bad ceiling tiles
Hide wires in elevator
Clean and organize closets
Switch plate covers
Elevator plague
Need a round coat tree
Paint walls


Exterior
Repair porch roof
Repair stoop on south side of back stairs
Sand blast and paint rear stairs
Landscape and rock in front of lodge
Exit and enter signs for back doors
Paint


Ground Floor South Side
Repair ceiling tiles
Switch plates
Cover phone cables
Clean or replace carpet
Smoke alarms and exit signs
Paint


Ground Floor North Side
Clean or replace all maroon carpet
Repair rodent damage and paint
Change lock on back door to exit only
Clean pantries and paint interior
Make a storage room near back door
Switch plates
Build shelving above sink area

« Previous Article